T&B(TnB), Thomas&Betts, Total Project Cost Reduction 가치솔루션 소개 

 

안녕하세요 TIATIP 입니다.

 

오늘은  T&B(토마스앤베츠, 티앤비, 티엔비, Thomas&Betts, TnB)의 제품과 서비스 가운데 프로젝트 전반의 비용절감, 원가절감에 관한 솔루션을 알아보도록 하겠습니다.    

 

 

T&B(TnB), Total Project Cost Reduction From Thomas&Betts 

 

T&B(TnB), Your Challenge: Cutting Costs without Cutting Corners
Today’s competitive environment requires everyone to work harder — and smarter. Every aspect of the way we do business must be examined to identify and eliminate waste.
Whether it’s labor, material, logistics or the process, managers must look for the most efficient way to get the job done. At the same time, codes are becoming increasingly stringent, allowing little room for deviation.

 

T&B(TnB), Thomas & Betts Can Help You Realize Significant Project Cost Savings

Thomas & Betts offers a wide array of electrical products designed to provide customers with significant and measurable project cost savings:

Labor Savings: Industry-leading products utilize pre-assemblies, ergonomic designs and innovative technology to help our customers reduce their total installation and operating costs. For example, Steel City® Pre-Fab Components are designed to significantly reduce project costs during the rough-in phase of a project. In addition, Steel City® Pre-Fab saves more money by shipping pre-assembled electrical rough-in products directly to a job site.

Material Savings: Special ARRA and Buy America assemblies can help reduce overall material costs as much as 40%.

Logistics Savings: Thomas & Betts will work with you to streamline how your order is packaged, labeled and delivered to ensure the most efficient process possible.

Process Improvements: Thomas & Betts is a leader in developing and implementing Web-based catalogs, CAD tools and BIM models to get the job done efficiently.

 

 

T&B(TnB), Solution - Totall Project Cost Reduction

Just as every manufacturer strives to eliminate waste, Thomas & Betts focuses on products that reduce the amount of labor required for installation and maintenance. Look to Thomas & Betts for lean products, processes that lock in top quality and components designed to require little or no maintenance.

 

 

T&B(TnB), Thomas & Betts products for total project cost reduction

 

Blackburn®
• Compression Connector and Tool System
• Comfort Crimp® Tools
• HEX-FLEX® Die System
• Motor Lead Disconnects

 

Carlon®
• ENT (Electrical Non-Metallic Tubing) System
• Adjust-A-Boxes
• Vapor-Proof Boxes

 

Homac®
• Flood-Seal® Splicing Kits
• Lay-In Type Connectors

 

Kindorf®
• Modular Framing System
• Fast Set Beam Clamp
• Trapnut® Strut Fastener

 

PMA®
• Flexible Nylon Conduit Systems

 

Sta-Kon®
• Dragon Tooth® Insulation-Piercing Connectors
• Hand Crimping Tools

 

Steel City®
• Boxes, Covers and Accessories
• Pre-Fab Assemblies

 

T&B® Fittings
• LU® Universal Conduit Elbow

 

Ty-Rap®
• Hand-Held Installation Tools
• Ty-Tote® Cable Tie Dispenser

 

  

 



T&B(TnB), Electrical Solutions for Totla Project Cost Reduction

 

 

 

Total Project Cost Reduction.pdf

T&B Products Lineup Company Profile 2011EN IDK.pdf

 

 

 

 

 

T&B, TNB, TaNdB

Thomas&Betts, ThomasaNdBetts

티앤비, 티엔비, 티앤드비, 티엔드비

토마스앤베츠, 토마스앤배츠, 토마스엔베츠, 토마스엔배츠

토머스앤베츠, 토머스앤배츠, 토머스엔베츠, 토머스엔배츠

  

 

 

 

 

 

  

내 기술지원 및 구매상담처

CUSTOMER SUCCESS IDK

deric@jadongwha.com

www.tiatip.com

 

 

+ Recent posts